You don't have javascript enabled. Good luck with that.
Pencarian
Pengurasan Saluran di Jalan Batang Hari Ditargetkan Rampung Akhir Januari

Channel Dredging Work on Jalan Batang Hari will Be Completed This Month

The channel dredging work which carried out since January 6 on Jalan Batang hari, RW 05, Cideng Urban Village, Gambir, Central Jakarta was targeted to finish by the end of this month.

Currently, we have dredged channel as long as 235 meters and transported 42.3 cubic meters mud

Gambir Sub-district Water Resources (SDA) Unit Head, Muhammad Imawan said, channel dredging progress has reached 66 percent or 235 meters of total length 355 meters.

"Currently, we have dredged channel as long as 235 meters and transported 42.3 cubic meters mud," he informed, Friday (1/21).

Water Channel on Jl. Prof. Dr. Satrio Dredged

According to him, it has width 60 centimeters and depth 70 centimeters with mud as thick as 40 centimeters.

"We deploy 10 personnel to dredge the channel," he mentioned.

Moreover, his side is also repairing damaged parts of channel along 7 meters. Personnel repair it manually using hoe, crowbar, shovel, plastic sack, and others.

"After being dredged, I hope residents can maintain its cleanliness," he stated.

Linked News
Popular News indeks
  1. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye974 personAldi Geri Lumban Tobing
  2. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye934 personAldi Geri Lumban Tobing
  3. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye834 personFakhrizal Fakhri
  4. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye710 personAldi Geri Lumban Tobing
  5. Chinese New Year Holiday, Ancol Flocked by Visitors

    access_time16-02-2026 remove_red_eye608 personAnita Karyati