You don't have javascript enabled. Good luck with that.
Pencarian
Pengurasan Saluran di Jalan Batang Hari Ditargetkan Rampung Akhir Januari

Channel Dredging Work on Jalan Batang Hari will Be Completed This Month

The channel dredging work which carried out since January 6 on Jalan Batang hari, RW 05, Cideng Urban Village, Gambir, Central Jakarta was targeted to finish by the end of this month.

Currently, we have dredged channel as long as 235 meters and transported 42.3 cubic meters mud

Gambir Sub-district Water Resources (SDA) Unit Head, Muhammad Imawan said, channel dredging progress has reached 66 percent or 235 meters of total length 355 meters.

"Currently, we have dredged channel as long as 235 meters and transported 42.3 cubic meters mud," he informed, Friday (1/21).

Water Channel on Jl. Prof. Dr. Satrio Dredged

According to him, it has width 60 centimeters and depth 70 centimeters with mud as thick as 40 centimeters.

"We deploy 10 personnel to dredge the channel," he mentioned.

Moreover, his side is also repairing damaged parts of channel along 7 meters. Personnel repair it manually using hoe, crowbar, shovel, plastic sack, and others.

"After being dredged, I hope residents can maintain its cleanliness," he stated.

Linked News
Popular News indeks
  1. Water Channel on Jalan SPG 7 Being Improved

    access_time18-09-2026 remove_red_eye763 personNurito
  2. Jakarta Govt Fully Backs Kanye West's Ye Live in Jakarta 2026

    access_time16-09-2026 remove_red_eye502 personDessy Suciati
  3. Jakarta Pushes to Strengthen Food Ecosystem

    access_time18-09-2026 remove_red_eye364 personAldi Geri Lumban Tobing
  4. 5M Movement Promoted to Create an Organized Utility Network

    access_time18-09-2026 remove_red_eye361 personFakhrizal Fakhri
  5. Pramono Departs for New York to Discuss Climate and Food Crises

    access_time18-09-2026 remove_red_eye348 personDessy Suciati